4 day break at Malihabad railway crossing, traffic will move through diversion
Lucknow
Lucknow Big news has come to light affecting the movement of common people in Malihabad area. Due to necessary repair work of the railway track, it has been decided to keep Malihabad railway crossing completely closed from April 4 to April 7. During this period, route diversion has been implemented by the administration to maintain the smooth traffic system in the area.
According to the information, this step has been taken by the Railway Department by giving priority to the works related to track repair and safety, so that any kind of accident can be avoided in future. During the repair work, movement of any type of vehicle through the crossing will be completely prohibited.
Alternative route for small vehicles:
Small vehicle drivers have been allowed to go to Lucknow-Hardoi Road via Mujasa Road. People can reach their destination using this route.
Route diversion for large vehicles:
Mahmood Nagar Dhal Road has been earmarked as an alternative route for heavy vehicles. Big vehicles will be able to travel on Lucknow-Hardoi road through this route.
During this period, special arrangements have been made by the local police and administration to manage the traffic system, so that jam-like situations do not arise and people have to face minimum problems.
On the other hand, the construction work of Goods Railway Flyover in Malihabad area is also progressing rapidly. After the completion of this project, it is expected that there will be relief from the problem of traffic jam in the area to a great extent.
The administration has appealed to the people to use only the prescribed alternative routes and not go towards closed railway crossings unnecessarily, so that any kind of inconvenience or accident can be avoided.
Comments are closed.