VIDEO: Huge explosion on railway line in Punjab, goods train engine driver injured
Chandigarh, January 24, 2026: Huge explosion on railway line in Punjab punjabThere was a massive explosion on the railway line in Fatehgarh Sahib district on Saturday morning, due to which approximately 12 feet of the railway track was completely broken. At the time of this incident, a goods train passing by got hit by it, due to which the engine got heavily damaged and the pilot got injured.
History of the incident:
According to the information received, this blast was so powerful that its sound could be heard far and wide. Due to the explosion, pieces of Lokhand Pata were thrown into the air. At the same time a goods train passing on the track engine This was along the broken track. Due to track damage, the engine suffered major damage and the people present in the cabin immediately shifted the pilot to the hospital due to serious injuries. Fortunately, the bogies of the goods train did not come off the platform, otherwise tragedy Could have been created.
#WATCH Fatehgarh Sahib, Punjab: Explosives recovered near railway track.
DIG Ropar Range Nanak Singh said, “We had received an information that there was a small blast here at night. The driver got a little injured. There is no damage to the train and track…Police are investigating it…soon… pic.twitter.com/9N3Tib5Wgp
— ANI_HindiNews (@AHindinews) January 24, 2026
Investigation and security agencies alert:
As soon as the incident was known RailwaySenior officials, local police and bomb disposal squad rushed to the spot. Security agencies have intensified investigation into whether these blasts on railway tracks were an accident or some big conspiracy. The forensic team has also taken samples from the spot to know what type of explosive was used.
Railway Transactions Khoravayo:
Due to this explosion, there has been a major impact on the functioning of trains on the Ambala-Ludhiana main railway route. Many passenger trains were stopped en route or their routes were changed. The track repairing work has been started by the technical team of Railways on war footing so that the work can be done as per the schedule as soon as possible.
Comments are closed.