Lakhs of drivers are soon going to get relief from the gruesome daily traffic jams on the Noida-Greater Noida Expressway, which is one of the busiest routes of Delhi-NCR. Noida Authority, after about two months of technical brainstorming, has officially approved the budget of ₹ 280 crore for the 10 km long expansion of Yamuna Pushta Road (Embankment Road). Under this ambitious project, the Yamuna Pushta Road currently constructed up to Sector-135 will be extended and directly connected to Yamuna Expressway (Greater Noida-Agra Expressway) via Sector-150. With the construction of this new four-lane road, drivers coming from Delhi's Kalindi Kunj, Okhla Barrage and Sector-94 of Noida will be able to drive directly towards Yamuna Expressway and the upcoming Noida International Airport (Jewar) without climbing the main Noida-Greater Noida Expressway. What is the complete route and construction plan? Rotary will be built on Yamuna Expressway via Sector-135 to Sector-150. According to the current geographical situation, the 11.5 km long Yamuna Pushta Road starting from Okhla Barrage (Sector-94) located near Kalindi Kunj, Delhi, is currently built only till Sector-135 (Advant) of Noida. There is a raw embankment of Yamuna river between Sector-135 and Sector-150, but due to lack of paved road, vehicular movement is not possible from here. Under the new plan, a modern 4-lane wide road will be constructed on this 10 kilometer stretch, which will run completely parallel to the Noida-Greater Noida Expressway. At the end of the plan, this new route will be connected to the expressway by building a big rotary (roundabout) near the Yamuna Expressway, so that the entry and exit of vehicles remains very smooth and safe. Since this entire route will be developed on the embankment land of the Government Irrigation Department, there is no possibility of any delay like land acquisition. UP Irrigation Department will do the construction for ₹280 crore, resurfacing of the old 11.5 km portion is also being done, Civil General Manager of Noida Authority, A.K. According to Arora, the Uttar Pradesh Irrigation Department had initially sent an estimated budget of around ₹350 crore for the construction of this four-lane road, but after a thorough technical review and cost analysis by the authority, it has been fixed at ₹280 crore. The entire financial cost of this project will be borne by the Noida Authority, while the construction work will be carried out by the Uttar Pradesh Irrigation Department. Along with this, Noida Authority has also allocated a separate budget of ₹ 34 crore for improving the condition and resurfacing of the already existing 11.5 km long pushta road from Okhla Barrage to Sector-135, work on which is going on at a fast pace. Soon a tender for the new 10 kilometer extension will be issued and ground construction will be started. Along with protection from floods, this new road will not only provide direct benefit to the residents of Sector-128 to Sector-150, but will also act as a flood protection embankment for the villages and residential sectors situated on the banks of Yamuna river. Increasing the height and strength of the embankment will significantly reduce the risk of flooding in the surrounding areas when the water level of Yamuna rises during monsoon. Apart from this, lakhs of residents living in Sector-95, 125, 128, 131, 135, 137, 140A, 150, 151, 152 and 168 as well as around Kondli-Bangar Road and employees working in IT parks and corporate offices will get relief from the traffic jams during morning and evening peak hours. A 50 km long elevated corridor will also be built in the future, traffic will reach Jewar Airport in 15 minutes. Along with the expansion of the surface 4-lane road, Noida Authority, Greater Noida Authority, Yamuna Authority (YEIDA) and National Highway Authority of India (NHAI) have together started work on another mega plan in view of the future traffic pressure. Under this, preparations are being made to build about 50 km long 8-lane elevated expressway (Elevated Corridor) over Yamuna Pushta Road from Kalindi Kunj to Sector-32C of Yamuna Authority, the estimated cost of which is estimated at ₹ 4,000 crore. Its Detailed Project Report (DPR) is being prepared by NHAI, after completion of which the distance from Delhi-NCR to Noida International Airport can be covered in just a few minutes.