Saigon River pedestrian bridge’s 3,400-ton steel arch moves onto barge in 4-hour operation

Earlier, from shortly after 10 p.m. the previous night, 30 self-propelled modular transporter (SPMT) units began moving the bridge’s steel arch onto the Trung Nam S05 barge, which is 109 m long and 37 m wide with a load capacity of more than 14,000 metric tons. The specialized transporters can rotate 360 degrees as they … Read more